TUNNEL EXCAVATION IN CLAYEY-MARLY FORMATIONS: THE CASE OF KALLIDROMO TUNNEL
Abstract
Keywords
Full Text:
PDFReferences
Office Malios S.A.. Final design study of the Kallidromo tunnel for the constructive joint
venture, 1998.
E. Hoek, unpublished site report, 3/6/2002.
P. Marinos, Professor of National Technical University of Athens, unpublished site report, 1/7/2002.
M. H. Aleksiadou, Geological design study of the Kallidromo tunnel for Ergose Company, 2003.
W. Wittke Professor Dr. Engineer, NAMA S.A, Final design study of the Kallidromo tunnel for Ergose
Company, 2003.
K. Mitsugi, Y. Kajiwara, Construction of the 3rd longest mountain tunnel in the world – Excavation
of swollen and soft mudstone layers, AITES – ITA 2001 World Tunnel Congress, Volume III.
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Nikolaos Diasakos, Panagiotis Amerikanos, Georgios Tryfonas, Eleni Vagiotou, Vassilios Baltzois, Stavros Bloukas, Theodoros Tagkas, Eleftherios Malandrakis

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
