[1]
Repousis, N. and Rausch, C. 2025. Quantity Take-Off Methods for Sustainable End-of-Life Strategies: 2D Drawings vs. 3D Scan-to-BIMs. Technical Annals. 1, 9 (Jan. 2025). DOI:https://doi.org/10.12681/ta.42344.