Repousis, N., & Rausch, C. (2025). Quantity Take-Off Methods for Sustainable End-of-Life Strategies: 2D Drawings vs. 3D Scan-to-BIMs. Technical Annals, 1(9). https://doi.org/10.12681/ta.42344