GEOLOGICAL AND GEOTECHNICAL BEHAVIOUR OF EVINOS DAM FOLLOWING THE IMPOUNDMENT


Δημοσιευμένα: Jan 1, 2010
A. Angelopoulos
V.J. Soulis
V. Malandraki
Περίληψη
The Evinos dam built between 1993 and 1997. The period of construction followed a period of rest until 2001. The impoundment of the Evinos Dam and the subsequent 3rd operational period took place between 2001 and 2005. The 4th period of operation commenced in February 2005 and concerns the period of regular operation of Dam Evinos after completion. During this period, sufficient data have been gathered for the evaluation of the geotechnical behaviour of both Evinos Dam itself and the stabilization works on the two landslides that occurred (Landslide of the left abutment ’93, Landslide of Ag.Demetrios-Arahova country road). Specialized personnel of the Department of the Evinos Dam of the Athens Water Supply and Sewage Company S.A are responsible for the in-situ collection of instrumental readings. On the other hand specialized personnel of the Division of Raw Water Intake of Athens Water Supply and Sewage Company S.A are assigned to evaluate the dam’s behaviour. The infiltration of water within the Dam’s core is continuously monitored together with the horizontal movement and settlement upstream and downstream the dam’s body through a considerable number of vibrating wire piezometers, earth pressure cells, extensiometers, inclinometers and surface monumental stations. The behaviour of the stabilization interventions in the landslide area’s are evaluated through measurement of topographic monuments ,open piezometers and drainage measurements. The evaluation of the instrumental measurerements confirms the expected behavior of the dam and the satisfactory performance of the stabilization interventions in the landslide area’s
Λεπτομέρειες άρθρου
  • Ενότητα
  • Τεχνική Γεωλογία και Γεωτεχνική Μηχανική
Λήψεις
Τα δεδομένα λήψης δεν είναι ακόμη διαθέσιμα.
Αναφορές
Angelopoulos A., Soulis V., Malandraki V., 2007. Evaluation of instrumental results during the 4th operational
period of Evinos Dam, October 2006-September 2007, Internal Report Issue No 16, Division
of Raw Water Intake, E.YD.A.P S.A, Greece, Athens .
Angelopoulos A., Soulis .V., Malandraki V., 2008. Evaluation of instrumental results during the 4th operational
period of Evinos Dam, October 2007-September 2008, Internal Report Issue No 17”, Division
of Raw Water Intake, E.YD.A.P S.A, Greece, Athens .
Dounias G., Dede V., 2006. Stabilization of the ’93 landslide at the Evinos reservoir with drainage galleries.
Proceedings of the 5th Greek Conference on Geotechical and Geoenvironmental Engineering,
Greece, Xanthi.
Dounias G., Belokas G., Marinos P., 2006. The Landslide of the Agios Demetrios-Arahova Country Road,
at the Evinos river Basin. Proceedings of the 5th Greek Conference on Geotechical and Geoenvironmental
Engineering, Greece, Xanthi.
Dounias G., 2006.The behaviour of clay core of the Evinos dam. Proceedings of the 5th Greek Conference
on Geotechical and Geoenvironmental Engineering, Greece, Xanthi.
Dounias, G. & Papageorgiou, E., 2001, “Stresses and Strains in the Evinos dam, Greece”, XVth International
Conference on Soil Mechanichs & Geotechnical Engineering. Istanbul, Vol. 1, pp. 401-404.
Τα περισσότερο διαβασμένα άρθρα του ίδιου συγγραφέα(s)