Evaluation of ground information with respect to EPB tunnelling for the Thessaloniki metro, Greece


P. G. Marinos
M. Novack
M. Benissi
G. Stoumpos
M. Panteliadou
D. Papouli
V. Marinos
K. Korkaris
Résumé

The Thessaloniki Metropolitan Railway comprises two separate ~6 m diameter parallel tunnels with an ~8 km stretch each and 13 stations. The geology of the urban area of Thessaloniki is characterised by the presence of Neogene and Quaternary deposits. The base formation for the project area is a very stiff to hard red clay, dating to Upper Miocene-Pliocene. Upon this formation, Quaternary sediments have been deposited, most of which comprise sand and/or gravel in a clay-silt dominated matrix, covered in places by anthropogenic fill. Ground investigation campaigns incorporated a significant number of sampling boreholes and in situ and laboratory testing. This information was elaborated in order to obtain a better geological understanding and a geotechnical zonation of the ground with respect to mechanized tunnelling. EPB M appears to be the reasonable choice for the project in all aspects of tunnel safety and tunnelling performance. The characteristics and parameters of the soils and the hydrogeological regime directed towards this selection and it is expected that all the objectives, such as settlement and ground movements control, water table level maintenance and adequate performance, will be met by an EPBM provided it is properly operated

Article Details
  • Rubrique
  • New Technologies in Geophysical and Geological Research
Téléchargements
Les données relatives au téléchargement ne sont pas encore disponibles.
Références
Anonymous, 2005. Closed-face tunnelling machines and ground stability, British Tunnelling Society (Closed-Face Working Group) in association with the Institution of Civil Engineers, Thomas Telford Publishing, London, 77pp.
Bell, F.G., 2000. Engineering properties of soils and rocks, Blackwell Science Ltd, Oxford, 482pp.
Geodata S.p.A., 1995. Report: Review of alternative construction methods and feasibility of proposed methods for constructing Attiko Metro Extension of Line 3 to Egaleo, Attiko Metro S.A., 191-193, Messogion Ave., 11525 Athens, Greece.
Herrenknecht, AG, unknown. Pioneering tunnelling technology for underground transport systems. (Brochure).
Kavvadas, M.J., 2005. Personal communication-material for the lectures of the module 'Foundations', National technical University of Athens, Iroon Politechniou 9, 15780 Zografou, Greece, (in Greek)
Langmaack, L., 2002. Soil conditioning for TBM-Chances and limits: Journées d'études internationals de Toulouse-Undergroundworks : Living structures, AFTES.
Terzaghi, K., Peck, R.B., and Mesri G., 1996. So/7 mechanics in engineering practice, John Wiley & Sons INC, New York, NY, 549pp.
Thewes, M., and Burger W., 2004. Clogging risks for TBM drives in clay, Tunnels & Tunnelling International, June 2004, 28-31.
Articles les plus lus par le même auteur ou la même autrice